New Bathroom

Refurbishment of a bathroom.

The first step is to remove all cabinets, shelving, and the existing bathroom suite, then the old tiles are removed.
If required, the bathroom layout can be re-designed to better match customer needs, eg moving bath, toilet or sink to better locations or to make space for additions (eg a shower). Plumbing is adjusted as necessary.
Finally the customer's selected new fittings are installed and the plumbing completed. The pipework is then boxed in, and the customer's choice of tiles are fitted and grouted.
HawkOwl Web Design